Tower Crane Aviation Light Configurator

This is a preview with bugs. Please print and send by Email!

In case of sudden service please give us a call.



1. What type of Crane and what lengths are involved?

For booms >90 m, please add the length in the comment. field.






2. Required Type of Light.






3. Uninterruptible Power Supply (UPS)

On many building sites a good choice is a time between end of working on Friday and beginn on Monday which is 96 hours.
Usually a UPS is mandatory - depending on local Requirements (for e.g. in Germany)





4. Control Box Front Panel Options





5. Control Options



6. Kable Lengths


Power supply Cable (3G2.5 H05-RN-F) - Fill in the required length

Light Cables (4G0,75 Shielded PUR Cable) - fill in the required length




7. Brackets






8 Customer Data and Comments