Tower Crane Aviation Light Configurator

This page is just in rework

In case of sudden service please give us a call.







2. Required Type of Light.






3. Uninterruptible Power Supply (UPS)

On many building sites a good choice is a time between end of working on Friday and beginn on Monday which is 96 hours.
Usually a UPS is mandatory - depending on local Requirements (for e.g. in Germany)





4. Control Box Front Panel Options


5. Control Options




6. Kable Lengths


Power supply Cable (3G2.5 H05-RN-F) - Fill in the required length

Light Cables (4G0,75 Shielded PUR Cable) - fill in the required length




7. Brackets